Building permits
Permit records describe reported or authorized work. They do not guarantee construction has started, finished, or that a business will open.
9,769 permits
- 2410 PALM DRInterior remodel for 3 units. Unit A: Replace window in living room, drywall 50 sq ft, bathroom remodel, fixtures in the same location. Unit B: Bathroom remodel, fixtures in the same location. Unit C: 3 window replacement (2 in living room, 1 kitchen), drywall 100 sqft in living room, Kitchen remodel, bathroom remodel, fixtures in same location.M24-00056Hermosa BeachMajor renovationFinaledIssued 2024-04-03Updated 2026-11-27
- 2410 PALM DRInterior remodel for 3 units. Unit A: Replace window in living room, drywall 50 sq ft, bathroom remodel, fixtures in the same location. Unit B: Bathroom remodel, fixtures in the same location. Unit C: 3 window replacement (2 in living room, 1 kitchen), drywall 100 sqft in living room, Kitchen remodel, bathroom remodel, fixtures in same location.E24-00090Hermosa BeachMajor renovationFinaledIssued 2024-04-03Updated 2026-11-27
- 76 17TH ST6.56kW roof mounted PV system, 15 microinverter/ modules, 1 tesla powerwall 2.0 + (1) 200A backup gateway + (1) 125A subpanel & main breaker derate to 175A. A certified heat detector will be installed inside the garage, above the batteryE24-00083Hermosa BeachResidentialFinaledIssued 2024-04-03Updated 2026-11-27
- 821 BARD STRBRX24-00046Hermosa BeachNon-constructionFinaledIssued 2024-04-03Updated 2026-11-27
- 2410 PALM DR$50,000Interior remodel for 3 units. Unit A: Replace window in living room, drywall 50 sq ft, bathroom remodel, fixtures in the same location. Unit B: Bathroom remodel, fixtures in the same location. Unit C: 3 window replacement (2 in living room, 1 kitchen), drywall 100 sqft in living room, Kitchen remodel, bathroom remodel, fixtures in same location. (IB-010 was provided at permit issuance)B24-00191Hermosa BeachMajor renovationFinaledIssued 2024-04-03Updated 2026-11-27
- 2130 MONTEREY BLVDDemo tile floor throughout, remove and replace 11 windows and doors, remodel kitchen & bathrooms (5)M24-00053Hermosa BeachDemolitionFinaledIssued 2024-04-02Updated 2026-11-27
- 316 MONTEREY BLVDBathroom remodel, dry wall repair as needed, new tile, remove tub install shower same location replace toilet, 2-sinks, 5-lights, 4-switches, 2 GFCI and 2-fan.P24-00059Hermosa BeachMajor renovationFinaledIssued 2024-04-02Updated 2026-11-27
- 300 PACIFIC COAST HWYTenant Improvement- Renovation of existing tenant space for new Good Vets store, consisting of complete tenant interior improvement. Demolition of select non-bearing walls, ceilings, plumbing and finishes. New construction including select new partitions and ceilings. New restrooms select electrical and mechanical within the landlords shell space in existing building.M24-00052Hermosa BeachDemolitionFinaledIssued 2024-04-02Updated 2026-11-27
- 300 PACIFIC COAST HWYTenant Improvement- Renovation of existing tenant space for new Good Vets store, consisting of complete tenant interior improvement. Demolition of select non-bearing walls, ceilings, plumbing and finishes. New construction including select new partitions and ceilings. New restrooms select electrical and mechanical within the landlords shell space in existing building.P24-00061Hermosa BeachDemolitionFinaledIssued 2024-04-02Updated 2026-11-27
- 3313 MANHATTAN AVEFire Sprinkler System for new SFRP24-00062Hermosa BeachResidentialIssuedIssued 2024-04-02Updated 2026-11-27
- 122 MONTEREY BLVD, #UNIT B(1) 75 Gallon Water Heater Changeout in Garage (Same location)P24-00060Hermosa BeachResidentialFinaledIssued 2024-04-02Updated 2026-11-27
- 316 MONTEREY BLVDBathroom remodel, dry wall repair as needed, new tile, remove tub install shower same location replace toilet, 2-sinks, 5-lights, 4-switches, 2 GFCI and 2-fan.M24-00051Hermosa BeachMajor renovationFinaledIssued 2024-04-02Updated 2026-11-27
- 941 13TH ST$28,000Partial re roof with clay tiles. Replacement of underlayment using a nail down base and one layer of SA torch down. (Total # of squares 21 squares)B24-00185Hermosa BeachOtherFinaledIssued 2024-04-02Updated 2026-11-27
- 677 5TH STRBRX24-00045Hermosa BeachNon-constructionFinaledIssued 2024-04-02Updated 2026-11-27
- 300 PACIFIC COAST HWY$500,000Tenant Improvement- Renovation of existing tenant space for new Good Vets store, consisting of complete tenant interior improvement. Demolition of select non-bearing walls, ceilings, plumbing and finishes. New construction including select new partitions and ceilings. New restrooms select electrical and mechanical within the landlords shell space in existing building.B23-00442Hermosa BeachDemolitionFinaled - CompleteIssued 2024-04-02Updated 2026-11-27
- 2007 AVA AVEFire Sprinkler System for New SFRP24-00057Hermosa BeachResidentialFinaledIssued 2024-04-02Updated 2026-11-27
- 49 8TH STRBRX24-00056Hermosa BeachNon-constructionFinaledIssued 2024-04-02Updated 2026-11-27
- 2456 MYRTLE AVESewer repair in front house (driveway) approx. 6'P24-00063Hermosa BeachOtherFinaledIssued 2024-04-02Updated 2026-11-27
- 300 PACIFIC COAST HWYTenant Improvement- Renovation of existing tenant space for new Good Vets store, consisting of complete tenant interior improvement. Demolition of select non-bearing walls, ceilings, plumbing and finishes. New construction including select new partitions and ceilings. New restrooms select electrical and mechanical within the landlords shell space in existing building.E24-00088Hermosa BeachDemolitionFinaledIssued 2024-04-02Updated 2026-11-27
- 316 MONTEREY BLVDBathroom remodel, dry wall repair as needed, new tile, remove tub install shower same location replace toilet, 2-sinks, 5-lights, 4-switches, 2 GFCI and 2-fan.E24-00086Hermosa BeachMajor renovationFinaledIssued 2024-04-02Updated 2026-11-27
- 710 1ST STInstall a 400A surface mounted main electrical panel & replace 9 125A SubpanelsE24-00069Hermosa BeachOtherFinaledIssued 2024-04-02Updated 2026-11-27
- 840 8TH PL$36,203Re-Roof (SFR)- Tear off 17 squares of shingles and 9 squares of bur material to 2-story Bldg. No new sheathing, Install GAF roof deck protection , then install GAF Timberline HDZ reflector series shingles in charcoal to sloped areas only. Flat areas, install IB roof systems 60mil PVC material.B24-00187Hermosa BeachResidentialFinaledIssued 2024-04-02Updated 2026-11-27
- 316 MONTEREY BLVD$10,000Bathroom remodel, dry wall repair as needed, new tile, remove tub install shower same location replace toilet, 2-sinks, 5-lights, 4-switches, 2 GFCI and 2-fan.B24-00186Hermosa BeachMajor renovationFinaledIssued 2024-04-02Updated 2026-11-27
- 447 2ND ST$12,000Kitchen remodel (replace cabinets and appliances)B24-00182Hermosa BeachMajor renovationIssuedIssued 2024-03-28Updated 2026-11-22
- 447 2ND STKitchen remodel (replace cabinets and appliances)P24-00056Hermosa BeachMajor renovationIssued 2024-03-28Updated 2026-11-22
| Permit | Address | City | Category | Issued | Status | Source | Declared value | Contractor |
|---|---|---|---|---|---|---|---|---|
| M24-00056 | 2410 PALM DR Interior remodel for 3 units. Unit A: Replace window in living room, drywall 50 sq ft, bathroom remodel, fixtures in the same location. Unit B: Bathroom remodel, fixtures in the same location. Unit C: 3 window replacement (2 in living room, 1 kitchen), drywall 100 sqft in living room, Kitchen remodel, bathroom remodel, fixtures in same location. | Hermosa Beach | Major renovation | 2024-04-03 | Finaled | City records Updated 2026-11-27 | — | BELA DEVELOPMENT |
| E24-00090 | 2410 PALM DR Interior remodel for 3 units. Unit A: Replace window in living room, drywall 50 sq ft, bathroom remodel, fixtures in the same location. Unit B: Bathroom remodel, fixtures in the same location. Unit C: 3 window replacement (2 in living room, 1 kitchen), drywall 100 sqft in living room, Kitchen remodel, bathroom remodel, fixtures in same location. | Hermosa Beach | Major renovation | 2024-04-03 | Finaled | City records Updated 2026-11-27 | — | BELA DEVELOPMENT |
| E24-00083 | 76 17TH ST 6.56kW roof mounted PV system, 15 microinverter/ modules, 1 tesla powerwall 2.0 + (1) 200A backup gateway + (1) 125A subpanel & main breaker derate to 175A. A certified heat detector will be installed inside the garage, above the battery | Hermosa Beach | Residential | 2024-04-03 | Finaled | City records Updated 2026-11-27 | — | SOLAR OPTIMUM DESIGN & ELECTRICAL |
| X24-00046 | 821 BARD ST RBR | Hermosa Beach | Non-construction | 2024-04-03 | Finaled | City records Updated 2026-11-27 | — | — |
| B24-00191 | 2410 PALM DR Interior remodel for 3 units. Unit A: Replace window in living room, drywall 50 sq ft, bathroom remodel, fixtures in the same location. Unit B: Bathroom remodel, fixtures in the same location. Unit C: 3 window replacement (2 in living room, 1 kitchen), drywall 100 sqft in living room, Kitchen remodel, bathroom remodel, fixtures in same location. (IB-010 was provided at permit issuance) | Hermosa Beach | Major renovation | 2024-04-03 | Finaled | City records Updated 2026-11-27 | $50,000 | BELA DEVELOPMENT |
| M24-00053 | 2130 MONTEREY BLVD Demo tile floor throughout, remove and replace 11 windows and doors, remodel kitchen & bathrooms (5) | Hermosa Beach | Demolition | 2024-04-02 | Finaled | City records Updated 2026-11-27 | — | VALENZUELA CONSTRUCTION COMPANY |
| P24-00059 | 316 MONTEREY BLVD Bathroom remodel, dry wall repair as needed, new tile, remove tub install shower same location replace toilet, 2-sinks, 5-lights, 4-switches, 2 GFCI and 2-fan. | Hermosa Beach | Major renovation | 2024-04-02 | Finaled | City records Updated 2026-11-27 | — | CONCEPT RENOVATIONS INC |
| M24-00052 | 300 PACIFIC COAST HWY Tenant Improvement- Renovation of existing tenant space for new Good Vets store, consisting of complete tenant interior improvement. Demolition of select non-bearing walls, ceilings, plumbing and finishes. New construction including select new partitions and ceilings. New restrooms select electrical and mechanical within the landlords shell space in existing building. | Hermosa Beach | Demolition | 2024-04-02 | Finaled | City records Updated 2026-11-27 | — | C R M CONSTRUCTION INCORPORATED |
| P24-00061 | 300 PACIFIC COAST HWY Tenant Improvement- Renovation of existing tenant space for new Good Vets store, consisting of complete tenant interior improvement. Demolition of select non-bearing walls, ceilings, plumbing and finishes. New construction including select new partitions and ceilings. New restrooms select electrical and mechanical within the landlords shell space in existing building. | Hermosa Beach | Demolition | 2024-04-02 | Finaled | City records Updated 2026-11-27 | — | C R M CONSTRUCTION INCORPORATED |
| P24-00062 | 3313 MANHATTAN AVE Fire Sprinkler System for new SFR | Hermosa Beach | Residential | 2024-04-02 | Issued | City records Updated 2026-11-27 | — | FIRE SAFE GROUP INC |
| P24-00060 | 122 MONTEREY BLVD, #UNIT B (1) 75 Gallon Water Heater Changeout in Garage (Same location) | Hermosa Beach | Residential | 2024-04-02 | Finaled | City records Updated 2026-11-27 | — | THE WATER HEATER & PLUMBING COMPANY DBA THE WATER HEATER COMPANY |
| M24-00051 | 316 MONTEREY BLVD Bathroom remodel, dry wall repair as needed, new tile, remove tub install shower same location replace toilet, 2-sinks, 5-lights, 4-switches, 2 GFCI and 2-fan. | Hermosa Beach | Major renovation | 2024-04-02 | Finaled | City records Updated 2026-11-27 | — | CONCEPT RENOVATIONS INC |
| B24-00185 | 941 13TH ST Partial re roof with clay tiles. Replacement of underlayment using a nail down base and one layer of SA torch down. (Total # of squares 21 squares) | Hermosa Beach | Other | 2024-04-02 | Finaled | City records Updated 2026-11-27 | $28,000 | FERNANDEZ ROOFING CORP |
| X24-00045 | 677 5TH ST RBR | Hermosa Beach | Non-construction | 2024-04-02 | Finaled | City records Updated 2026-11-27 | — | — |
| B23-00442 | 300 PACIFIC COAST HWY Tenant Improvement- Renovation of existing tenant space for new Good Vets store, consisting of complete tenant interior improvement. Demolition of select non-bearing walls, ceilings, plumbing and finishes. New construction including select new partitions and ceilings. New restrooms select electrical and mechanical within the landlords shell space in existing building. | Hermosa Beach | Demolition | 2024-04-02 | Finaled - Complete | City records Updated 2026-11-27 | $500,000 | C R M CONSTRUCTION INCORPORATED |
| P24-00057 | 2007 AVA AVE Fire Sprinkler System for New SFR | Hermosa Beach | Residential | 2024-04-02 | Finaled | City records Updated 2026-11-27 | — | SILVER STAR PLUMBING INC |
| X24-00056 | 49 8TH ST RBR | Hermosa Beach | Non-construction | 2024-04-02 | Finaled | City records Updated 2026-11-27 | — | — |
| P24-00063 | 2456 MYRTLE AVE Sewer repair in front house (driveway) approx. 6' | Hermosa Beach | Other | 2024-04-02 | Finaled | City records Updated 2026-11-27 | — | SERVICE HERO DBA ROOTER HERO |
| E24-00088 | 300 PACIFIC COAST HWY Tenant Improvement- Renovation of existing tenant space for new Good Vets store, consisting of complete tenant interior improvement. Demolition of select non-bearing walls, ceilings, plumbing and finishes. New construction including select new partitions and ceilings. New restrooms select electrical and mechanical within the landlords shell space in existing building. | Hermosa Beach | Demolition | 2024-04-02 | Finaled | City records Updated 2026-11-27 | — | C R M CONSTRUCTION INCORPORATED |
| E24-00086 | 316 MONTEREY BLVD Bathroom remodel, dry wall repair as needed, new tile, remove tub install shower same location replace toilet, 2-sinks, 5-lights, 4-switches, 2 GFCI and 2-fan. | Hermosa Beach | Major renovation | 2024-04-02 | Finaled | City records Updated 2026-11-27 | — | CONCEPT RENOVATIONS INC |
| E24-00069 | 710 1ST ST Install a 400A surface mounted main electrical panel & replace 9 125A Subpanels | Hermosa Beach | Other | 2024-04-02 | Finaled | City records Updated 2026-11-27 | — | HAS ELECTRIC INCORPORATED DBA THE ELECTRIC CONNECTION |
| B24-00187 | 840 8TH PL Re-Roof (SFR)- Tear off 17 squares of shingles and 9 squares of bur material to 2-story Bldg. No new sheathing, Install GAF roof deck protection , then install GAF Timberline HDZ reflector series shingles in charcoal to sloped areas only. Flat areas, install IB roof systems 60mil PVC material. | Hermosa Beach | Residential | 2024-04-02 | Finaled | City records Updated 2026-11-27 | $36,203 | CHANDLER'S ROOFING |
| B24-00186 | 316 MONTEREY BLVD Bathroom remodel, dry wall repair as needed, new tile, remove tub install shower same location replace toilet, 2-sinks, 5-lights, 4-switches, 2 GFCI and 2-fan. | Hermosa Beach | Major renovation | 2024-04-02 | Finaled | City records Updated 2026-11-27 | $10,000 | CONCEPT RENOVATIONS INC |
| B24-00182 | 447 2ND ST Kitchen remodel (replace cabinets and appliances) | Hermosa Beach | Major renovation | 2024-03-28 | Issued | City report ↗ Updated 2026-11-22 | $12,000 | OWNER/BUILDER |
| P24-00056 | 447 2ND ST Kitchen remodel (replace cabinets and appliances) | Hermosa Beach | Major renovation | 2024-03-28 | — | City report ↗ Updated 2026-11-22 | — | OWNER/BUILDER |
Know what's changing before everyone else.
Get local development news, restaurant openings, and neighborhood updates delivered by South Bay Scoop.
